Facilities
Overall site capacity is now 65,000 tonnes including the additional storage completed in 2011. Importantly it is the capacity of the processing equipment that is installed that offers the most significant benefits to members.
Intake Facilities
Aberdeen Grain has a 600tph intake capacity ensuring quick turn round of vehicles and the ability to ensure a maximum 72 hour collection from time of combining over the harvest period.
Drying Facilities
We have a drying capacity of 3000 tonnes per day. There are a total of 5 driers on site providing a highly efficient and environmentally beneficial grain conditioning solution for growers and customers alike.
Below are some statistics from this year's harvest:
Most loads collected from 1 member in a day: 18 (236 Tonnes)
Most loads collected from furthest member in a day: 5
Average turnaround time on site: Malting Barley 29 minutes
Average turnaround time on site: Feed Grains 25 minutes
Most loads delivered by 1 lorry in a day: 9
Average Spring Barley intake moisture: 19.58%
Busiest intake day 22nd September: 2703 T